Steps and Procedures for House Decoration

The steps and procedures for house decoration can vary based on specific renovation needs and the scale of the project. Here are the general steps and detailed procedures for house renovation:

1. Design Phase:

  • Requirement Communication: Discuss with designers or renovation companies to understand the renovation needs and style preferences.

  • Space Planning: Complete the layout design, determine room functions, furniture placements, etc.

  • Design Proposal: Develop an interior design plan, including style, materials, colors, etc., and confirm with the owner.

2. Preparation Phase:

  • Signing Renovation Contract: Sign a formal contract with the renovation company or contractor, clarifying the scope, quality standards, and schedule.

  • Material Selection: Choose appropriate renovation materials and home products based on the design plan and proceed with purchasing.

  • Preparation for Construction: Determine the construction team, prepare necessary tools and equipment, and set up temporary facilities at the construction site.

3. Demolition and Electrical/Plumbing Installation:

  • Demolition Work: Conduct demolition of walls, floors, ceilings, etc., as needed.

  • Wall Construction: Build new walls and partitions, and repair wall surfaces.

  • Electrical and Plumbing: Arrange electrical wiring and plumbing throughout the house, including water supply, drainage, and power.

4. Masonry Work:

  • Foundation Work: Level the floor and treat wall surfaces.

  • Plastering Work: Plaster walls and ceilings.

5. Carpentry and Painting:

  • Carpentry Work: Make and install wooden products like cabinets, wardrobes, doors, windows, and stairs.

  • Painting Work: Paint or spray walls and ceilings.

6. Flooring and Tiling:

  • Flooring Installation: Install wooden floors, tiles, carpets, etc.

  • Tile Installation: Lay wall tiles and floor tiles, and handle waterproofing and grouting.

7. Installation:

  • Interior Doors and Windows Installation: Install interior doors, windows, and glass products.

  • Bathroom and Kitchen Installation: Install bathroom fixtures, kitchen cabinets, and sanitary ware.

8. Lighting and Home Decor Installation:

  • Lighting Installation: Install various lighting fixtures such as chandeliers, recessed lights, and wall lights.

  • Home Decor Installation: Install curtain rails, hang paintings, and bathroom hardware.

9. Cleaning and Acceptance:

  • Cleaning: Conduct thorough cleaning to maintain a tidy renovation area.

  • Acceptance and Repairs: Conduct a final inspection with the renovation company or contractor and identify any areas that need fixing.

Please note that these are general steps and procedures, and the specific renovation process may vary based on different house types, renovation requirements, and construction team arrangements. In actual renovations, it is recommended to have detailed communication and consultation with professional renovation companies or designers to create a personalized renovation plan.


Categories

Contact Us

Contact: Ling Chen

Phone: +86 13660780342

E-mail: ling@mccdecoration.com

Whatsapp:+86 13660780342

Add: B310, Building 3, Huada Construction Materials City, 228 Shagang New Road, Shiwan Town, Chancheng District, Foshan City